1. ASCE Research Library

<A> Journal of Management in Engineering, Volume 27, Issue 3 (July, 2011)

1. Public-Private Partnerships in U.S. Transportation: Research Overview and a Path Forward
2. Empirical Study of Risk Assessment and Allocation of Public-Private Partnership Projects in China
3. Integrated Qualitative and Quantitative Methodology to Assess Validity and Credibility of Models for Bridge Maintenance Management System Development
4. Asset Management Assessment Model for State Departments of Transportation
5. Project Network Interdependency Alignment: New Approach to Assessing Project Effectiveness
6. Dual Impact of Cultural and Linguistic Diversity on Project Network Performance

 

<B> Journal of Architectural Engineering, Volume 16, Issue 2 (June, 2011)

3. Integrating Sustainable Design into Architectural Engineering Education: UNL-AE Program

 

<C> Journal of Construction Engineering and Management, Volume 137, Issue 8 (July, 2011)

6. Applying Optimal Control Model to Dynamic Equipment Allocation Problem: Case Study of Concrete-Faced Rockfill Dam Construction Project
7. Use of Safety and Lean Integrated Kaizen to Improve Performance in Modular Homebuilding
8. Fuzzy Repetitive Scheduling Method for Projects with Repeating Activities

 

<D> Journal of Infrastructure Systems, Volume 17, Issue2 (June, 2011)

 

2. Science Direct

<A> Automation in Construction, Volume20, Issue 4 (July, 2011)

1. Automated multi-objective optimization system for airport site layouts
2. Optimal earth pressure balance control for shield tunneling based on LS-SVM and PSO
3. Testing in harsh conditions: Tracking resources on construction sites with machine vision
4. Augmented reality-based computational fieldwork support for equipment operations and maintenance
5. Dimension optimization of an orientation fine-tuning manipulator for segment assembly robots in shield tunneling machines
6. An algorithm for the calculation of feasible mobile crane position areas
7. Coupling analysis of finite element and finite volume method for the design and construction of FPSO crane
8. Photogrammetric 3D modelling and mechanical analysis of masonry arches: An approach based on a discontinuous model of voussoirs
9. Formalisms for query capture and data source identification to support data fusion for construction productivity monitoring
10. Design of a construction management data visualization environment: A top–down approach
11. Assessment of conformance and interoperability testing methods used for construction industry product models
12. Augmented heuristic algorithm for multi-skilled resource scheduling
13. Integrating BIM and gaming for real-time interactive architectural visualization
14. A decision-making system for construction site layout planning
15. Measuring and visualizing hot mix asphalt concrete paving operations
16. Feedback analysis of tunnel construction using a hybrid arithmetic based on Support Vector Machine and Particle Swarm Optimisation

 

<B> International Journal of Project Management, Volume 29, Issue 5 (July, 2011)

1. Special issue: Project history: International journal of project management
2. Managing the project learning paradox: A set-theoretic approach toward project knowledge transfer
3. The spiritual identity of projects
4. Promoting the integration of users and developers to achieve a collective mind through the screening of information system projects
5. Guided reflection on project definition
6. Developing risk breakdown structure for information technology organizations
7. Relationships among interpersonal conflict, requirements uncertainty, and software project performance
8. Towards a conceptualisation of quality in information technology projects
9. Fixing the contract after the contract is fixed: A study of incomplete contracts in IT and construction projects
10. An empirical survey of the motives and benefits of adopting guaranteed maximum price and target cost contracts in construction
11. Modelling optimal risk allocation in PPP projects using artificial neural networks
12. An empirical examination of project contractors' supply-chain cash flow performance and owners' payment patterns
13. An extension of the EVM analysis for project monitoring: The Cost Control Index and the Schedule Control Index
14. Understanding stakeholders' perspective of cost estimation in project management
15. Investigating the rationale for adopting an internationally-recognised project management methodology in Ireland: The view of the project manager